What size wire for a 100 amp subpanel?
1 AWG aluminum feeder, 100 A breaker
A 100 A subpanel feeder needs at least 1 AWG aluminum SER for a 50 ft run, with a 6 AWG ground.
Assumes a 100 A feeder breaker, aluminum SER cable with 75°C terminals, a 50 ft run. Change the inputs.
100 amp subpanel feeder by distance
| Conductor and run | Answer |
|---|---|
| Aluminum, 25 ft | 1 AWG aluminum feeder, 100 A breaker |
| Aluminum, 100 ft | 1 AWG aluminum feeder, 100 A breaker |
| Aluminum, 150 ft | 1 AWG aluminum feeder, 100 A breaker |
| Aluminum, 250 ft | 2/0 AWG aluminum feeder, 100 A breaker |
| Copper, 50 ft | 3 AWG copper feeder, 100 A breaker |
| Copper, 150 ft | 3 AWG copper feeder, 100 A breaker |
Not 2 AWG aluminum
You will see "2 AWG aluminum for 100 amps" in forums. That comes from NEC 310.12, which allows a smaller conductor for a dwelling's service or main feeder, because a whole house never draws its full rating. It does not apply to a subpanel feeder. A 100 A subpanel needs conductors rated 100 A: 1 AWG aluminum or 3 AWG copper at 75°C.
Four wires
A subpanel feeder has two hots, a neutral and a ground. In the subpanel the neutral bar stays isolated from the box and the ground bar is bonded to it. A subpanel in a detached garage or shop also needs its own ground rods and a disconnect. Have a licensed electrician confirm the feeder and grounding.
Run it for your house
The calculator below starts from the assumptions above. Change any input and the answer updates.
1 AWG aluminum feeder, 100 A breaker
A 100 A subpanel feeder needs at least 1 AWG aluminum SER for a 50 ft run, with a 6 AWG ground.
- Feeders to a subpanel need four wires (two hots, neutral, ground), and the neutral and ground must be separated in the subpanel.
- A subpanel feeder uses the full 75°C ampacity. The 83% rule (NEC 310.12) applies only to the service or main feeder of a dwelling, not to subpanels.
- The 75°C column only applies if the breaker, the appliance and every terminal are rated 75°C. NM-B (Romex) is always 60°C.
- Aluminum: use AL-rated lugs, antioxidant paste, and torque to spec. We never suggest aluminum smaller than 6 AWG.
- Wiring is a fire risk when it's wrong. Most places require a permit; have a licensed electrician confirm the wire, breaker and terminations before anything is energized.
How we got there
| Feeds | A subpanel | full 75°C ampacity; the 83% rule does not apply |
|---|---|---|
| Circuit | 100 A circuit | 240 V |
| Load | 100.0 A | |
| Breaker | 100 A double-pole | next standard size up |
| Wire type | SER / feeder cable, 75°C terminals | 75°C ampacity column |
| Smallest wire for the breaker | 1 AWG aluminum | 100 A (NEC 310.16) |
| Voltage drop over 50 ft | 0.8% | 2.0 V at 80.0 A |
| Equipment ground | 6 AWG aluminum | NEC 250.122 |
What to look for
Examples only, not endorsements: model names checked 2026-11-26. Confirm the exact capacity on the spec sheet before you buy. We earn nothing from these.
Questions
Can I use 2 AWG aluminum for a 100 A subpanel?
Not under the NEC's ampacity table: 2 AWG aluminum is rated 90 A at 75°C, so it can feed a 90 A breaker. The 83% allowance in 310.12 is only for the main service of a dwelling.
What size for 100 amps at 200 ft?
Voltage drop pushes the size up, typically to 1/0 aluminum at that distance. The table above shows each step.